Tank replacement project including removal and installation of two 20,000‑gallon tanks and system upgrades.

Zahl PMC completed a full fuel system replacement for United Parcel Service (UPS) in Minneapolis, Minnesota. The scope included demolition and removal of the existing fueling infrastructure—two 20,000 gallon USTs, ten dispensers, island forms, electrical runs, light poles, the DEF shed, the oil/water separator, the Veeder Root TLS 350, and all associated underground piping.
New infrastructure included two 20,000 gallon Xerxes tanks, transition and piping sumps, double wall OmegaFlex product piping, containment systems, submersible pumps, upgraded dispensers, new electrical and lighting, a DEF shed, an oil/water separator, and a Veeder Root TLS 450 Plus. The completed system provides UPS with a modern, compliant, and reliable fueling operation built for high demand use.